- Empennage
- Wings
- Fuselage
- Assembly
- Firewall Forward
- Landing Gear
- Painting
- Panel
- Interior
- Jigs
- Engine Building
- Wiring
|
Log Entries For Main Gear
| Date | Summary |
|
Oct 15, 2011
|
LG Nuts
|
|
Oct 14, 2011
|
Installing the Wheels and Brakes
|
|
Oct 13, 2011
|
Wheel Bearings
|
|
Oct 12, 2011
|
Painting the gear
|
|
Oct 11, 2011
|
Main Wheels
|
|
Oct 10, 2011
|
Main Wheels
|
|
Feb 24, 2011
|
Forks cont.
|
|
Feb 24, 2011
|
Mounting the gear
|
|
Feb 19, 2011
|
Installing the Mains
|
|
Feb 8, 2011
|
L/G Fork
|
|
Aug 2, 2010
|
Drilling the lower mounts
|
|
Aug 1, 2010
|
M/G lower mounts
|
|
Jul 27, 2010
|
M/G lower mounts
|
|
Jul 26, 2010
|
Painted LG
|
|
Jul 25, 2010
|
Priming LG
|
|
Jul 24, 2010
|
L/G prep
|
|
May 31, 2010
|
Preparing the mains
|
|
Dec 13, 2009
|
L/G upper plates
|
|
ExperCraft is supported by these quality vendors:
|