Log Entries For Forward Fuselage


DateSummary
Oct 4, 2005 Forward Fuselage Sides Hardware and Firewall
Oct 5, 2005 NACA Vents and Side Panel Assembly
Oct 6, 2005 Forward Fuselage Sides assembly
Oct 7, 2005 Installing the Forward Fuselage Sides onto the Aft Fuselage
Oct 20, 2005 Seat Lowering Mod, Seat Belt Brackets and Elevator Bellcrank Idler
Nov 10, 2005 Fastening Forward Fuselage Bottom Skin and Lower Firewall
Dec 1, 2005 Installing Forward Spar Carry Through and Floor Structure
Dec 5, 2005 Installing Forward Spar Carry Through and Floor Structure continued
Dec 6, 2005 Installing Floor Stiffeners , Seat Sling Structure and Seat Sling

ExperCraft is supported by these quality vendors: