- Empennage
- Wings
- Fuselage
- Assembly
- Firewall Forward
- Landing Gear
- Painting
- Weight And Balance
- Pre Flight
- Panel
- Interior
- Engine Building
- Wiring
|
Log Entries For Flight Controls
| Date | Summary |
|
Nov 21, 2011
|
Installed Down Bungee and Set Pull to 8# per Rans Manual
|
|
Sep 21, 2011
|
Installed Flap Handle Assembly
|
|
Sep 10, 2011
|
Trim Motor
|
|
Feb 22, 2011
|
Drilled Flap Weldment to Accept Down Bungee Eyelet
|
|
Jun 29, 2010
|
Mounted Stabilator Trim Motor
|
|
Feb 21, 2010
|
Aft Stabilator Bellcrank Redo
|
|
Oct 6, 2009
|
Wired Ray-Allen Relay Deck to Both Control Sticks
|
|
Oct 5, 2009
|
Wire Copilot PTT & Trim
|
|
Oct 4, 2009
|
Wire Pilot Side Control Stick PTT and Trim
|
|
Sep 6, 2009
|
Flap Handle
|
|
Aug 20, 2009
|
Assembled Flap Handle
|
|
Dec 7, 2008
|
Assembled Control Sticks, Torque Tube and Forward/Aft Stabilator Tubes
|
|
Dec 3, 2008
|
Installed fair leads
|
|
Nov 19, 2008
|
Threaded Rudder Cables Through Center Fuselage
|
|
Oct 13, 2008
|
Cut Out Fair Leads
|
|
Oct 12, 2008
|
Aft Stabilator Push-Pull Tube Installation
|
|
ExperCraft is supported by these quality vendors:
|