Log Entries For Flight Controls


DateSummary
Nov 21, 2011 Installed Down Bungee and Set Pull to 8# per Rans Manual
Sep 21, 2011 Installed Flap Handle Assembly
Sep 10, 2011 Trim Motor
Feb 22, 2011 Drilled Flap Weldment to Accept Down Bungee Eyelet
Jun 29, 2010 Mounted Stabilator Trim Motor
Feb 21, 2010 Aft Stabilator Bellcrank Redo
Oct 6, 2009 Wired Ray-Allen Relay Deck to Both Control Sticks
Oct 5, 2009 Wire Copilot PTT & Trim
Oct 4, 2009 Wire Pilot Side Control Stick PTT and Trim
Sep 6, 2009 Flap Handle
Aug 20, 2009 Assembled Flap Handle
Dec 7, 2008 Assembled Control Sticks, Torque Tube and Forward/Aft Stabilator Tubes
Dec 3, 2008 Installed fair leads
Nov 19, 2008 Threaded Rudder Cables Through Center Fuselage
Oct 13, 2008 Cut Out Fair Leads
Oct 12, 2008 Aft Stabilator Push-Pull Tube Installation