Log Entries For Flaps


DateSummary
Dec 4, 2011 Installed and Set Flaps
Apr 29, 2009 Fitted/Drilled Flap Hinges to Rear Spar
Apr 28, 2009 Riveted Bottom Side of Right Flap
Apr 28, 2009 Completed Riveting of Bottom and then Top Side of Left Flap
Apr 28, 2009 Completed Deburring Flap Frames, Cleaned Flap Skins and Primered Interior
Apr 27, 2009 Edge Polished/Deburred Both Flap Skins
Apr 25, 2009 Formed the Right Leading Edge Flap Skin
Apr 22, 2009 Worked on Bending Leading Edge of Flaps
Apr 21, 2009 Drilled Top Side of Left Flap
Apr 20, 2009 Finished Drilling Left Bottom Flap Skin #40
Apr 19, 2009 Rolled Leading Edge of Left Flap Skin
Apr 19, 2009 Riveted Left Flap Frame
Apr 18, 2009 Modified Aft End of Flap Ribs to Avoid Skin Bulges
Apr 17, 2009 Deburred/Edge Polished Both Flap Frames
Apr 14, 2009 Disassembled Flap Frames and Began Deburring/Edge Polishing Parts
Apr 13, 2009 Cleco'd Drilled Flap Frames #40
Apr 13, 2009 Transfer Drilled Flap Frames to #30
Apr 12, 2009 Bent The Required 6.5deg. on the Flap Root Rib Support Angles
Apr 11, 2009 Cleco'd Ribs to Right Flap Spar and Began Fitting/Transfer Drilling Root End Parts
Apr 10, 2009 Completed Transfer Drilling Hinges to Flap Spars #40
Apr 9, 2009 Finished Marking Up Flap Hinges and Began Transfer Drilling Hinges to Flap Spars #40
Apr 8, 2009 Gathered Parts for Flaps and Began Mark Up of Flap Hinges

ExperCraft is supported by these quality vendors: