- Empennage
- Wings
- Fuselage
- Assembly
- Firewall Forward
- Landing Gear
- Painting
- Weight And Balance
- Pre Flight
- Panel
- Interior
- Engine Building
- Wiring
|
Log Entries For Flaps
| Date | Summary |
|
Dec 4, 2011
|
Installed and Set Flaps
|
|
Apr 29, 2009
|
Fitted/Drilled Flap Hinges to Rear Spar
|
|
Apr 28, 2009
|
Riveted Bottom Side of Right Flap
|
|
Apr 28, 2009
|
Completed Riveting of Bottom and then Top Side of Left Flap
|
|
Apr 28, 2009
|
Completed Deburring Flap Frames, Cleaned Flap Skins and Primered Interior
|
|
Apr 27, 2009
|
Edge Polished/Deburred Both Flap Skins
|
|
Apr 25, 2009
|
Formed the Right Leading Edge Flap Skin
|
|
Apr 22, 2009
|
Worked on Bending Leading Edge of Flaps
|
|
Apr 21, 2009
|
Drilled Top Side of Left Flap
|
|
Apr 20, 2009
|
Finished Drilling Left Bottom Flap Skin #40
|
|
Apr 19, 2009
|
Rolled Leading Edge of Left Flap Skin
|
|
Apr 19, 2009
|
Riveted Left Flap Frame
|
|
Apr 18, 2009
|
Modified Aft End of Flap Ribs to Avoid Skin Bulges
|
|
Apr 17, 2009
|
Deburred/Edge Polished Both Flap Frames
|
|
Apr 14, 2009
|
Disassembled Flap Frames and Began Deburring/Edge Polishing Parts
|
|
Apr 13, 2009
|
Cleco'd Drilled Flap Frames #40
|
|
Apr 13, 2009
|
Transfer Drilled Flap Frames to #30
|
|
Apr 12, 2009
|
Bent The Required 6.5deg. on the Flap Root Rib Support Angles
|
|
Apr 11, 2009
|
Cleco'd Ribs to Right Flap Spar and Began Fitting/Transfer Drilling Root End Parts
|
|
Apr 10, 2009
|
Completed Transfer Drilling Hinges to Flap Spars #40
|
|
Apr 9, 2009
|
Finished Marking Up Flap Hinges and Began Transfer Drilling Hinges to Flap Spars #40
|
|
Apr 8, 2009
|
Gathered Parts for Flaps and Began Mark Up of Flap Hinges
|
|
ExperCraft is supported by these quality vendors:
|