- Empennage
- Wings
- Fuselage
- Assembly
- Firewall Forward
- Landing Gear
- Weight And Balance
- Pre Flight
- Panel
- Interior
- Jigs
- Wiring
|
Log Entries For Miscellaneous
| Date | Summary |
|
Jan 14, 2012
|
Instrument Panel Reassembly
|
|
Dec 30, 2011
|
Instrument Panel Decoration
|
|
May 24, 2011
|
Playing....kinda'
|
|
Jan 3, 2011
|
Wiring Cleanup
|
|
Dec 31, 2010
|
Decals - Engine Power Group
|
|
Oct 3, 2010
|
Glove Box Lid
|
|
Jul 9, 2010
|
Thanks Lucas!
|
|
Jan 23, 2010
|
Glovebox fab and Main Bus wiring
|
|
Jan 18, 2010
|
More Glovebox
|
|
Jan 17, 2010
|
Continued glove box and other panel cutting
|
|
Jan 16, 2010
|
Began fabrication of glove box
|
|
Oct 24, 2009
|
Panel Fab and Wiring
|
|
Oct 11, 2009
|
Plans and Drawings again + some metal cutting
|
|
Oct 10, 2009
|
Plans and Drawings
|
|
Sep 27, 2009
|
Experimented with LEDs and sold radios.
|
|
Sep 6, 2009
|
Cut the Altimeter hole
|
|
Aug 23, 2009
|
Holey shemoley
|
|
Aug 22, 2009
|
Refined the panel layout and started cutting
|
|
Aug 17, 2009
|
Scrounging for dollars #4
|
|
Aug 17, 2009
|
Scrounging for dollars #3
|
|
Aug 16, 2009
|
Scrounging for dollars #1
|
|
Aug 15, 2009
|
Installed TruTrac Servos (1 of 2)
|
|
Aug 15, 2009
|
Installed TruTrac Servos (2 of 2)
|
|
Jun 7, 2009
|
Fabricated Engine control cable brackets
|
|
May 26, 2009
|
Brackets
|
|
May 25, 2009
|
Mounting Brackets
|
|
Apr 12, 2009
|
Panel Brackets F721C and D
|
|
Apr 11, 2009
|
Top Instrument Panel Brace F-703B
|
|
ExperCraft is supported by these quality vendors:
|