- Empennage
- Wings
- Fuselage
- Firewall Forward
- Landing Gear
- Panel
- Engine Building
- Wiring
|
Log Entries For Baffling And Cooling
| Date | Summary |
|
Sep 30, 2011
|
install baffle material to bottom cowl air inlet
|
|
Sep 26, 2011
|
worked on the front baffle seal and installed blast tubes
|
|
Sep 23, 2011
|
finished baffle material at the
|
|
Sep 20, 2011
|
added plastic tube quarter inch outside diameter
|
|
Sep 20, 2011
|
fabricated support bracket for cylinders 1 and 2 bafile
|
|
Sep 19, 2011
|
readjusted oil cooler
|
|
Sep 19, 2011
|
readjusted oil cooler
|
|
Sep 16, 2011
|
shaved more off the baffels.
|
|
Sep 13, 2011
|
worked on cylinder 3 and 4 baffles
|
|
Sep 12, 2011
|
conical gussett
|
|
Sep 11, 2011
|
spent most of the time cutting and trimming
|
|
Sep 9, 2011
|
assemble the cowl inlet baffels drilled clecoed
|
|
Sep 6, 2011
|
trimmed more from the back baffels installed
|
|
Sep 2, 2011
|
trim and fit rear baffel to upper cowl,
|
|
Sep 2, 2011
|
started to work on right 4 baffel, cut out area
|
|
Aug 29, 2011
|
started baffel install. removed hatched areas of the
|
|
ExperCraft is supported by these quality vendors:
|