DateSummary
Sep 30, 2011 install baffle material to bottom cowl air inlet
Sep 26, 2011 worked on the front baffle seal and installed blast tubes
Sep 23, 2011 finished baffle material at the
Sep 20, 2011 added plastic tube quarter inch outside diameter
Sep 20, 2011 fabricated support bracket for cylinders 1 and 2 bafile
Sep 19, 2011 readjusted oil cooler
Sep 19, 2011 readjusted oil cooler
Sep 16, 2011 shaved more off the baffels.
Sep 13, 2011 worked on cylinder 3 and 4 baffles
Sep 12, 2011 conical gussett
Sep 11, 2011 spent most of the time cutting and trimming
Sep 9, 2011 assemble the cowl inlet baffels drilled clecoed
Sep 6, 2011 trimmed more from the back baffels installed
Sep 2, 2011 trim and fit rear baffel to upper cowl,
Sep 2, 2011 started to work on right 4 baffel, cut out area
Aug 29, 2011 started baffel install. removed hatched areas of the