Log Entries For Parts Preparation


DateSummary
Oct 22, 2012 Installed fire extinguisher.met jim gilchrist for final inspection
Oct 19, 2012 removed copilot stick. replaced panel decal with n number.
Oct 14, 2012 Calibrated Left tank. started engine and tested radio again
Oct 13, 2012 got transponder certificate completed. performed weight and balance
Oct 13, 2012 got transponder certificate completed. performed weight and balance
Oct 11, 2012 configuring vPX, and Skyview, neutralized the elevators
Oct 9, 2012 finished installing fuel cover, screws in fuse floor and side panels.fabricated and installed firewall plug
Oct 9, 2012 finished installing fuel cover, screws in fuse floor and side panels.fabricated and installed firewall plug
Oct 6, 2012 installing seatbelts, covering baggage area, and center fuselage.
Sep 28, 2012 working on wing fairing.
Sep 23, 2012 filled gas tanks and drained checking for debris. troubleshooting leaky gas line.
Sep 20, 2012 Replaced brake lines damaged during move.
Sep 5, 2012 installing elevator pushrod,rewiring dimmers, adjusting angle on aileron and flaps
Aug 28, 2012 Attached wings and fuel vent lines
Aug 23, 2012 glassing filling sanding . moved fuse to hanger on trailer
Aug 15, 2012 Sanding, glassing, filling
Aug 2, 2012 Layed fiberglass and peel ply
Aug 1, 2012 Preparing windshield, gluing, masking and sanding
Jul 18, 2012 been working on final install of the canopy
Jul 14, 2012 Finished riveting skins on fuse. Painted black on dash and around edge of windshield
May 13, 2012 This entry is really the last 2 weeks. I have been running antenna cable for
Mar 8, 2011 Match drilled and dimpled the forward fuse and skin. Removed temp rivets on fuse. Removed extra material on roll bar brace. Drilled 721 C and D to fuse
Jul 2, 2010 Review fuse from 8.1 to 8.11
Jun 28, 2010 Bought a qb wing, fuse and finish kit. #5

ExperCraft is supported by these quality vendors: