- Empennage
- Wings
- Fuselage
- Firewall Forward
- Landing Gear
- Panel
- Engine Building
- Wiring
|
Log Entries For Miscellaneous
| Date | Summary |
|
May 14, 2012
|
Working on wing tip
|
|
Feb 28, 2011
|
Finished marking drilling and removing wings. Added plate nuts to inboard bottom. Added platenut to gastank attach bracket. 5 hrs.
|
|
Feb 7, 2011
|
Squared the wings, set the incidence. And drilled for an AN5. 3 hours
|
|
Feb 3, 2011
|
Finished riveting wing skins. Mounted and leveled left wing
|
|
Sep 27, 2010
|
Attached landing light pos and neg heat shrinked and tested zip tied bundle
|
|
Sep 26, 2010
|
Removed left wing wire bundle added 14 guage for landing light added 22 guage pair for OAT. 3 HRS
|
|
Sep 25, 2010
|
Installed d-sub connectors for roll servo. Braided wires and ran through wing. 2 hrs.
|
|
Sep 3, 2010
|
installed wing ap mount.
|
|
Aug 30, 2010
|
Me and Casey printed on shrink fit tubing for the wing wires
|
|
Aug 10, 2010
|
Ran the dynon sv-net-servo auto pilot wire in the right wing
|
|
Aug 9, 2010
|
ran wire for oat
|
|
Aug 2, 2010
|
drilled pitot mast hole and installed conduit
|
|
Jun 28, 2010
|
Bought a qb wing, fuse and finish kit. #4
|
|
Jun 28, 2010
|
Bought a qb wing, fuse and finish kit. #3
|
|
Jun 28, 2010
|
Bought a qb wing, fuse and finish kit. #2
|
|
Jun 28, 2010
|
Bought a qb wing, fuse and finish kit #1.
|
|
ExperCraft is supported by these quality vendors:
|