Log Entries For Miscellaneous


DateSummary
May 14, 2012 Working on wing tip
Feb 28, 2011 Finished marking drilling and removing wings. Added plate nuts to inboard bottom. Added platenut to gastank attach bracket. 5 hrs.
Feb 7, 2011 Squared the wings, set the incidence. And drilled for an AN5. 3 hours
Feb 3, 2011 Finished riveting wing skins. Mounted and leveled left wing
Sep 27, 2010 Attached landing light pos and neg heat shrinked and tested zip tied bundle
Sep 26, 2010 Removed left wing wire bundle added 14 guage for landing light added 22 guage pair for OAT. 3 HRS
Sep 25, 2010 Installed d-sub connectors for roll servo. Braided wires and ran through wing. 2 hrs.
Sep 3, 2010 installed wing ap mount.
Aug 30, 2010 Me and Casey printed on shrink fit tubing for the wing wires
Aug 10, 2010 Ran the dynon sv-net-servo auto pilot wire in the right wing
Aug 9, 2010 ran wire for oat
Aug 2, 2010 drilled pitot mast hole and installed conduit
Jun 28, 2010 Bought a qb wing, fuse and finish kit. #4
Jun 28, 2010 Bought a qb wing, fuse and finish kit. #3
Jun 28, 2010 Bought a qb wing, fuse and finish kit. #2
Jun 28, 2010 Bought a qb wing, fuse and finish kit #1.

ExperCraft is supported by these quality vendors: