- Empennage
- Wings
- Fuselage
- Firewall Forward
- Landing Gear
- Panel
- Engine Building
- Wiring
|
Log Entries For Parts Preparation
| Date | Summary |
|
Sep 30, 2012
|
finished installing Wing fairings
|
|
Sep 24, 2012
|
troubleshooting fuel lines replaced fitting. pump 2 tanks of fuel
|
|
Sep 12, 2012
|
Attached angle of incidence bolt pinned. Attached front breakaway bolt
|
|
Sep 12, 2012
|
Attached angle of incidence bolt pinned. Attached front breakaway bolt
|
|
Sep 11, 2012
|
installed flap connection set incremental down and slow retract
|
|
Sep 2, 2012
|
fabricated a new bushing for right flap. installed for connecting rods
|
|
Sep 2, 2012
|
fabricated a new bushing for right flap. installed for connecting rods
|
|
Aug 31, 2012
|
installed 2 of 4 14 a bolts worked on pass through bolts
|
|
Aug 30, 2012
|
Installing flaps and ailerons updated dynon firmware installed n number on tail.
|
|
Jun 18, 2012
|
assembled the fuel tank floats and fittings pressure tested the
|
|
Jun 11, 2012
|
Finished installing wing tip. Reinstalled d sub connectors
|
|
Jan 18, 2011
|
Primed the inside bottom wing skins. Clecoed skins to wing. Clecoed pitot mount to wing.
|
|
Jun 28, 2010
|
Bought a qb wing, fuse and finish kit. #6
|
|
ExperCraft is supported by these quality vendors:
|