Log Entries For Parts Preparation


DateSummary
Sep 30, 2012 finished installing Wing fairings
Sep 24, 2012 troubleshooting fuel lines replaced fitting. pump 2 tanks of fuel
Sep 12, 2012 Attached angle of incidence bolt pinned. Attached front breakaway bolt
Sep 12, 2012 Attached angle of incidence bolt pinned. Attached front breakaway bolt
Sep 11, 2012 installed flap connection set incremental down and slow retract
Sep 2, 2012 fabricated a new bushing for right flap. installed for connecting rods
Sep 2, 2012 fabricated a new bushing for right flap. installed for connecting rods
Aug 31, 2012 installed 2 of 4 14 a bolts worked on pass through bolts
Aug 30, 2012 Installing flaps and ailerons updated dynon firmware installed n number on tail.
Jun 18, 2012 assembled the fuel tank floats and fittings pressure tested the
Jun 11, 2012 Finished installing wing tip. Reinstalled d sub connectors
Jan 18, 2011 Primed the inside bottom wing skins. Clecoed skins to wing. Clecoed pitot mount to wing.
Jun 28, 2010 Bought a qb wing, fuse and finish kit. #6

ExperCraft is supported by these quality vendors: