Log Entries for Baggage Area
Log Entry Date: Feb 20, 2010
Baggage Area
#134 Aft Storage Support Deck
While Ray worked on the areas he wanted to accomplish today, I worked on setting up a little more rigidity in the area between F-6 & F-8. I constructed a false bulkhead and centered it between 6 & 8 then riveted it in place. This bulkhead will also act as a shelf for the offset control rod wich is being designed. I am not happy with the way my control rod is set in an offset position in the plane at this time. The rod now is designed to opperate through a set of nylon bearings running in the vertical supports of the bulkheads.
This even in the static configuration still produces some binding friction and when in flight I feel it will only progressively increase. I want to design a system that shifts the control rod to the center of the fuselage and carries the load directly down the center of the bulkheads.
This even in the static configuration still produces some binding friction and when in flight I feel it will only progressively increase. I want to design a system that shifts the control rod to the center of the fuselage and carries the load directly down the center of the bulkheads.
| Setting the cross support beams for the sub floor |
