Right wing ready for varnish. Right aileron still needs leading edge skin, then ready for varnish. 2/14/09
 
Fuse sitting on gear for the first time 2/14/09.
 
Cartoon airbike from somewhere on the internet.

Pete's Ison Tandem Airbike construction log and notes
Please sign my guestbook! I love to hear what people have to say about the project.

Check out the project section of my webpage to see a three view drawing and some pictures of what my plane is going to look like when it is done.

Currently working on:

Final welding details on fuselage and seat cushions (8-9-09)

All of the structural welding is complete on the fuselage. The torque tubes are installed, front seat frame fit. Gear legs and tail feathers are done.

To do before powdercoating airframe:
(8-23-09)

Throttle cable aft end mount
Throttle rod guide
Bracket for brake option
Fabricate elevator control assembly
Drill vertical fin, brake lever
Gusset at front wing attach
Finish fitting brakes to gear legs
Rudder pedal spring washers




Assembly of right wing is close to being done but currently on hold til the weather warms up a little. (1-13-09)

Ribs are attached to the spars, all of the compression struts and drag braces are in place as well as their gussets. Trailing edge of aileron is on along with the gussets on the top and bottom. Aileron spar web is in, as well as the aileron nose ribs. Cross pieces in between the trailing edge and aileron spar web are in. Fuel tank floor support diagonals, fuel tank floor, etc are all done. All of the nose ribs are on the front spar. Front side of front spar as well as all of the nose ribs are varnished and the leading edge skin is on. Wing strut fitting and wing attach fitting on the front spar have been installed, as well as a nut plate for the jury strut bracket. Aileron has been cut off and fit to wing. Trailing edge on the top and bottome of the ribs has been installed.

Still need to do on the right wing before cover:

Install aileron leading edge skin. Fabricate fuel tank hold down parts. Varnish the rest of the wing. Install fuel tank and fitting in fuel tank. Fit fiberglass wing tip. Paint the fittings that have not been installed yet. Install strut fittings, wing attach fittings on rear spar and jury strut fitings on both spars.

Other parts that are complete: (8-23-09)


All 30 ribs
All of the nose ribs
All of the aileron nose ribs
All of the aileron box ribs
Both front spars
Both rear spars
All 8 of the strut tabs
All 8 strut attach fittings
All 8 wing attach fittings
All four rudder pedals
Front throttle lever
Both jury strut spreader channels
Both rear jury strut brackets
Both front jury strut brackets
Flap mixer channel
Fuselage
Both gear legs
Torque tubes
Throttle levers
Front seat frame
Elevator
Rudder
Vertical fin
Horizontal tail
All 4 seat cushions
R & L cowling mount brackets

ExperCraft is supported by these quality vendors: