- Empennage
- Wings
- Fuselage
- Assembly
- Firewall Forward
- Landing Gear
- Weight And Balance
- Pre Flight
- Panel
- Interior
- Wiring
|
Log Entries For Miscellaneous
| Date | Summary |
|
Apr 17, 2012
|
Finished fiberglass work and tested radio.
|
|
Apr 10, 2012
|
Test fitted canopy frame and cowling.
|
|
Apr 5, 2012
|
Test fitted cowling. Started on canopy.
|
|
Apr 3, 2012
|
More work on cowlings.
|
|
Mar 29, 2012
|
Worked on engine cooling system.
|
|
Mar 27, 2012
|
More fitting of cowling.
|
|
Mar 26, 2012
|
More fitting and trimming.
|
|
Mar 22, 2012
|
Made up bracket for oil cooler.
|
|
Mar 20, 2012
|
Worked on top cowling.
|
|
Feb 16, 2012
|
Started on designing buffers for air flow intake.
|
|
Feb 8, 2012
|
Changed EGT to Exhaust side and trimmed fins.
|
|
Sep 21, 2011
|
Continued wiring.
|
|
Sep 2, 2011
|
Sorted wires from EMS 220 to engine.
|
|
Aug 31, 2011
|
Tested canopy to crash bar (Windshield support)
|
|
Aug 26, 2011
|
More study on wiring.
|
|
Aug 24, 2011
|
Sorted out wires.
|
|
Aug 19, 2011
|
Finished EGT and CHT wires.
|
|
Aug 17, 2011
|
Worked on installing gascolater and fittings.
|
|
Aug 8, 2011
|
Routed cables and installed brackets.
|
|
Aug 5, 2011
|
Routed and installed break lins to breaks on wheels.
|
|
Aug 3, 2011
|
located and installed shunt and brackets for cables.
|
|
Aug 1, 2011
|
Installed cabin heat boxes and routed cables.
|
|
Jul 28, 2011
|
Removed engine and started installing firewall equipm.
|
|
Jul 21, 2011
|
Installed el. fuel pump and fuel flow meter.
|
|
Jul 14, 2011
|
Spent hours chasing fittings for fuel line. installed CHT and EGT.
|
|
Jul 13, 2011
|
Met with EAA tecnical advisor.
|
|
Jul 11, 2011
|
Fitted sylinder cooling system. Temp. installed hoses.
|
|
Jul 8, 2011
|
Installing cabin heat hoses and looking for parts.
|
|
Jun 29, 2011
|
Completed oil hoses. Fixed heat muff. Installed scat bubing.
|
|
Jun 28, 2011
|
Fitted oil cooler and prepped oil hoses.
|
|
Jun 27, 2011
|
Mounted engine and worked on heat box
|
|
Jun 22, 2011
|
Melted 20 lbs of tire lead for counter weights.
|
|
Jun 21, 2011
|
Prepping and installing cabin heat box and oil collescter.
|
|
Jun 16, 2011
|
Unpacked engine and started installing parts.
|
|
Jun 13, 2011
|
Took inventory of engine parts.
|
|
ExperCraft is supported by these quality vendors:
|