Log Entries For Miscellaneous


DateSummary
Apr 17, 2012 Finished fiberglass work and tested radio.
Apr 10, 2012 Test fitted canopy frame and cowling.
Apr 5, 2012 Test fitted cowling. Started on canopy.
Apr 3, 2012 More work on cowlings.
Mar 29, 2012 Worked on engine cooling system.
Mar 27, 2012 More fitting of cowling.
Mar 26, 2012 More fitting and trimming.
Mar 22, 2012 Made up bracket for oil cooler.
Mar 20, 2012 Worked on top cowling.
Feb 16, 2012 Started on designing buffers for air flow intake.
Feb 8, 2012 Changed EGT to Exhaust side and trimmed fins.
Sep 21, 2011 Continued wiring.
Sep 2, 2011 Sorted wires from EMS 220 to engine.
Aug 31, 2011 Tested canopy to crash bar (Windshield support)
Aug 26, 2011 More study on wiring.
Aug 24, 2011 Sorted out wires.
Aug 19, 2011 Finished EGT and CHT wires.
Aug 17, 2011 Worked on installing gascolater and fittings.
Aug 8, 2011 Routed cables and installed brackets.
Aug 5, 2011 Routed and installed break lins to breaks on wheels.
Aug 3, 2011 located and installed shunt and brackets for cables.
Aug 1, 2011 Installed cabin heat boxes and routed cables.
Jul 28, 2011 Removed engine and started installing firewall equipm.
Jul 21, 2011 Installed el. fuel pump and fuel flow meter.
Jul 14, 2011 Spent hours chasing fittings for fuel line. installed CHT and EGT.
Jul 13, 2011 Met with EAA tecnical advisor.
Jul 11, 2011 Fitted sylinder cooling system. Temp. installed hoses.
Jul 8, 2011 Installing cabin heat hoses and looking for parts.
Jun 29, 2011 Completed oil hoses. Fixed heat muff. Installed scat bubing.
Jun 28, 2011 Fitted oil cooler and prepped oil hoses.
Jun 27, 2011 Mounted engine and worked on heat box
Jun 22, 2011 Melted 20 lbs of tire lead for counter weights.
Jun 21, 2011 Prepping and installing cabin heat box and oil collescter.
Jun 16, 2011 Unpacked engine and started installing parts.
Jun 13, 2011 Took inventory of engine parts.

ExperCraft is supported by these quality vendors: