Log Entries For Forward Fuselage


DateSummary
Dec 22, 2011 Filled in cracks around firewall.
Aug 22, 2011 Glued on insulation on sidewalls.
Aug 9, 2011 Worked on right side stick.
Jul 26, 2011 Continued fitting fuselage panelling.
Jul 18, 2011 Started cutting out interior panels.
Apr 26, 2011 Riveted forward side panels. Joined front and center.
Apr 23, 2011 Connected center and forward fuselage.
Apr 21, 2011 Riveted floor in seat area. Clecoed seat glide parts in place.
Apr 20, 2011 Clecoed side skin to forward fuselage. Prepped parts.
Apr 15, 2011 Located parts for seats and prepped floor plate for center fuselage.
Apr 14, 2011 Designed and maded bracket for Dynon controll unit.
Apr 11, 2011 Designed and prepped bracket for ELT.
Apr 7, 2011 Plumbed rudder pedals for break lines.
Apr 6, 2011 Worked on fitting landing gear to blocks.
Mar 31, 2011 Installed controll arm on el. trim. Painted parts,Installed sticks.
Mar 28, 2011 Worked on Johnson bar, flap controll, block fittings.
Mar 25, 2011 Disassembeled front skins and separated parts.
Mar 24, 2011 Test fitted forward top skin, Drilled forward longeron.
Mar 22, 2011 Located and fitted stiffeners between front and center section.
Mar 21, 2011 Painted center floor panels and insp. plates
Mar 18, 2011 Located sheets and inspection plates for center floor.
Mar 17, 2011 Prepped airvets and installed. Riveting.
Mar 15, 2011 Fitted ruder pedals, break cylinders, riveting.
Mar 11, 2011 Finished bend in side skins, fitted blocks for rudder pedals.
Mar 9, 2011 Transfer ddrilled holes on side panels and bottom panel.
Mar 7, 2011 Disassembeled sidewalls. Riveted nut plate in panel frame.
Mar 4, 2011 Clecoed forward side panels and drilled for auto p. bracket.
Mar 2, 2011 Reassembeled parts and started riveting firewall.
Mar 1, 2011 Primed parts for firewall and floor.
Feb 27, 2011 Deburred and cleaned sidewall stiffeners and bulk head.
Feb 25, 2011 More deburring and sanding.
Feb 23, 2011 Deburred and cleaned parts from floor section.
Feb 22, 2011 Clecoed floor and stiffeners.
Feb 18, 2011 Disassembeled upper parts and prepped.
Feb 17, 2011 Clecoed upper fuselage and firewall
Feb 16, 2011 Cleaned tabeles and started collecting parts for forward fuselage.

ExperCraft is supported by these quality vendors: