DateSummary
Aug 15, 2011 Finished stick. Installed insulation.
Apr 27, 2011 Installed instrument frame and joined rear to center.
Feb 1, 2011 Deburred and prepped close out. Drilled longerons to #40
Jan 28, 2011 Reassembeled and tweeked trim tab on B-5.
Jan 23, 2011 Continued prepping parts.
Jan 10, 2011 Finished deburring rivet heads on bottom skin.
Jan 9, 2011 Riveted bottom center skin.
Jan 8, 2011 Turned unit over and prepped for riveting bottom skin.
Jan 7, 2011 Riveted side skins.
Jan 4, 2011 Completed priming and installing nut plates
Jan 2, 2011 Continued seat and luggage floor
Jan 1, 2011 Prep. of seat and luggage floars.
Dec 16, 2010 Continued to prep parts for seat and luggage floor.
Dec 14, 2010 Finished side panel and bottm panel
Dec 8, 2010 Prepping side panels.
Dec 7, 2010 Prepped and primed stiffenters for side panels
Dec 3, 2010 Located and fitted stiffeners on bottom skin.
Dec 2, 2010 Clecoed stiffeners and seat belt hook up.
Dec 1, 2010 Fine tund longerons.
Nov 30, 2010 Clecoed parts from yesterday. Bent longerons.
Nov 29, 2010 Aft bulkhead #1. Debur and prep.
Nov 24, 2010 Assembeled aft spar #1. Worked on bottom and side panels.
Nov 23, 2010 Prepped rear spar #1 and primed
Nov 19, 2010 Completed forming stiffeners and riveted.
Nov 18, 2010 Clecoed, bolted and riveted parts to center spar.
Nov 17, 2010 Deburred and primed center spar and seat spars.
Nov 17, 2010 Deburred and primed center spar and seat spars.
Nov 15, 2010 Reemed wings and center spar.
Nov 12, 2010 Prepped parts and clecoed and bolted spar.
Nov 11, 2010 Started sorting out part for carry through spar.