Log Entries For Rear Fuselage


DateSummary
May 2, 2012 Connected rudder and elevator with finale bolts and nutts.
Jun 23, 2011 Finished trimming counterweights.
Jun 3, 2011 Finished stinger.
Jun 1, 2011 More cutting and fitting of stinger.
May 29, 2011 Started trimming parts for stinger.
May 24, 2011 Installed step and vertical stabilizer.
May 3, 2011 Riveted side stiffeners to firewall and rear section to center.
Apr 28, 2011 Joined rear and center fuselage together.
Feb 14, 2011 Finished drilling skin to #30. Took skin of and disassembeled.
Feb 12, 2011 Installed bolts on center section gear block
Feb 11, 2011 Seat belt upper hoock up. Upper skins.
Feb 10, 2011 Installed trim motor, Test fitted center and back unit.
Feb 8, 2011 Completed cleaning and priming front and rear longerons.
Feb 7, 2011 Installed ends of push pull rods.
Feb 4, 2011 Located parts for push pull and pulley installation.
Feb 3, 2011 Riveted sides and bottom sheets
Feb 2, 2011 Checked vertical stabilizer for square and fitting. Riveted sideskin.
Jan 31, 2011 Finished trim tab, worked on bulk H #4.
Jan 27, 2011 Started putting parts back together.
Jan 20, 2011 Disassembeled parts of rear fuselage and prepped parts.
Jan 19, 2011 Deburred, cleaned and primed parts for #5.
Jan 17, 2011 Deburred and fitted parts for bulk head #5.
Jan 14, 2011 Located and clecoed more parts for rear fuselage.
Jan 13, 2011 Assambeled parts for rear fuselage.
Jan 12, 2011 Started locating parts for rear fuselage.
Jan 10, 2011 Found parts and started assemble parts

ExperCraft is supported by these quality vendors: