Log Entries For Skins


DateSummary
Oct 14, 2010 Started on leading edge right wing.
Oct 12, 2010 Switched to right wing skins.
Oct 11, 2010 Prepped and enstalled wingtip skins
Oct 7, 2010 Riveted leading edge skin.
Oct 4, 2010 Leading edge prep.
Sep 30, 2010 Deburring bottom right skin.
Sep 28, 2010 Riveted left bottom skin.
Sep 24, 2010 Installed tank cover.
Sep 22, 2010 Finished top left skin.
Sep 21, 2010 Drilling and cleaning top left Skin
Sep 19, 2010 Deburred and cleaned rear left skin.
Sep 16, 2010 Lower left skin prep.
Sep 9, 2010 Drlled leading edge skin.
Sep 8, 2010 Transfer drilled right wing to #30.
Sep 7, 2010 Transfer dirlled left wing skins to #30
Jul 26, 2010 Drilled right top rear skin to #40.
Jul 23, 2010 Drilled left rear skinn to #40

ExperCraft is supported by these quality vendors: