Log Entries For Flaps


DateSummary
Aug 20, 2010 Cleaned, primed and riveted right flap.
Aug 17, 2010 Drilled skin to #30.
Aug 16, 2010 Hinges.
Aug 13, 2010 Bent leading edge of flaps
Aug 10, 2010 Cleaned and primed second flap.
Aug 9, 2010 Assambeled and riveted flap.
Aug 8, 2010 Disassembeled, deburred, cleaned and primed.
Aug 5, 2010 Drilling and prepping flalp parts.
Aug 4, 2010 Flaps and hinges.
Aug 3, 2010 Flaps
Aug 2, 2010 Flaps.
Jul 13, 2010 Clecoed right flap

ExperCraft is supported by these quality vendors: