Log Entries For Miscellaneous
| Date | Summary |
|
Sep 8, 2008
|
Installed ELT mounting bracket.
|
|
Sep 6, 2008
|
Just a few pix of the near complete project.
|
|
Jul 25, 2008
|
Well the garage is empty! Scotto picked up the fuselage today for painting, will get it back in about 2 weeks.
|
|
Jul 2, 2008
|
Trimmed and installed nutplates for stablizer fairind to fuselage.
|
|
Mar 8, 2008
|
Installed fuselage fuel system valve to wing root
|
|
Jan 27, 2008
|
installed right grip
|
|
Jan 26, 2008
|
Drilled left stick for infinity grip
|
|
Jan 1, 2008
|
Fit pilot seat and installed pilot stick, for grip measurments. Measured and cut stick to proper length.
|
|
Oct 31, 2007
|
Assemble rudder bar and master cylinders.
|
|
Oct 28, 2007
|
Just caught up on a small list of things to do inspection plates clraned up interior metal ETC.
|
|
Sep 24, 2007
|
Fabricated and installed components for throttle quadrant
|
|
Sep 23, 2007
|
Fabricated components for center quadrant
|
|
Sep 22, 2007
|
Drilled and installed firewall shields for wiring pass thru
|
|
Sep 22, 2007
|
mounted fuel valve and plumbed to fuel pump.
|
|
Sep 2, 2007
|
Finished flap mechanism, drilled and install nut-plates for side covers and top support attachments.
|
|
Sep 1, 2007
|
Mounted flap torque tube and support pieces. Drilled side cover attach holes
|
|
Aug 31, 2007
|
Fitted foreward flap assembly
|
|
Aug 25, 2007
|
installed fuel pump and flow transducer
|
|
Aug 22, 2007
|
Fab Battery tie down, install left side fuel vent line and fittings
|
|
Aug 5, 2007
|
Prosealed and rivited firewall recess
|
|
Jul 16, 2007
|
Fabricated parking brake lines
|
|
Jul 15, 2007
|
Fabricated doubler for parking brake
|
|
Jul 14, 2007
|
Drilled Gascolator doubler
|
|