Log Entries For Flight Controls


DateSummary
Sep 11, 2008 Completed rigging of all flight controls.
May 7, 2008 Started fabrication of throttle and mixture cable clamping assembly
Sep 23, 2007 Start design and layout of throttle quadrant
Sep 12, 2007 Installed stick control assembly.Installed both control rubes and adjusted length
Sep 11, 2007 Fab bellcrank to elevator control tube
Sep 10, 2007 Fab control stick to belcrank torque tube
Jul 8, 2007 Mounted Pitch servo

ExperCraft is supported by these quality vendors: