- Empennage
- Wings
- Fuselage
- Assembly
- Firewall Forward
- Landing Gear
- Painting
- Weight And Balance
- Pre Flight
- Panel
- Interior
- Engine Building
- Wiring
|
Log Entries For Flight Controls
| Date | Summary |
|
Sep 11, 2008
|
Completed rigging of all flight controls.
|
|
May 7, 2008
|
Started fabrication of throttle and mixture cable clamping assembly
|
|
Sep 23, 2007
|
Start design and layout of throttle quadrant
|
|
Sep 12, 2007
|
Installed stick control assembly.Installed both control rubes and adjusted length
|
|
Sep 11, 2007
|
Fab bellcrank to elevator control tube
|
|
Sep 10, 2007
|
Fab control stick to belcrank torque tube
|
|
Jul 8, 2007
|
Mounted Pitch servo
|
|
ExperCraft is supported by these quality vendors:
|