Log Entries For Baggage Area
| Date | Summary |
|
Jan 13, 2013
|
Deburred Baggage Skins and Tunnel
|
|
Jan 12, 2013
|
Continued to Work On Control Tunnel Mod
|
|
Jan 11, 2013
|
Worked On Control Tunnel Mod
|
|
Jan 9, 2013
|
Recut and Bent Tunnel Side Plate
|
|
Mar 8, 2012
|
Final Drilled Baggage Centre Lid
|
|
Mar 7, 2012
|
Fitted and Drilled Baggage Centre Lid
|
|
Feb 5, 2012
|
Deburred Baggage Area
|
|
Feb 2, 2012
|
Final Drilled Baggage Skins
|
|
Jan 31, 2012
|
|
|
Jan 29, 2012
|
Fabricated Baggage Area Tie Down Points
|
|
Jan 26, 2012
|
Right Baggage Bottom Skin
|
|
Jan 24, 2012
|
Right Baggage Area
|
|
Jan 22, 2012
|
Worked on Right Baggage Area
|
|
Jan 21, 2012
|
Worked on Left Baggage Area
|
|
Jan 19, 2012
|
Decided to Fabricate New Lower Left Baggage Skin
|
|
Jan 19, 2012
|
Decided to Fabricate New Lower Left Baggage Skin
|
|
Jan 12, 2012
|
Fitting Left Side Baggage Panels
|
|
Jan 8, 2012
|
Installing Baggage bottoms and Seat Bottoms
|
|
Jan 4, 2012
|
Flaperon Control Rod Box(es) Installation
|
|
Jan 4, 2012
|
Flaperon Control Rod Box(es) Installation
|
|
Jan 3, 2012
|
Started Fitting Lower Baggage Skins
|
|
Dec 31, 2011
|
Rear Baggage Bulkhead
|
|
Dec 31, 2011
|
Rear Baggage Bulkhead
|
|
Dec 30, 2011
|
Riveted 75F4-6 Brackets in place
|
|
Nov 16, 2011
|
Installed Baggage Area
|
|
Oct 22, 2011
|
Worked on LVE's Fuselage
|
|
Jul 10, 2011
|
Baggage Area Progress
|
|
Jul 2, 2011
|
Worked on Baggage Area
|
|
Jun 25, 2011
|
Started Placement of Baggage Pieces
|
|
May 21, 2011
|
Upper Baggage Area Bulkhead
|
|
May 18, 2011
|
Started on Baggage Skins
|
|