Log Entries For Forward Fuselage


DateSummary
Mar 24, 2012 Moved Fuselage From Trav's to My Garage
Feb 4, 2012 Finished the Initial Group Build!!!
Feb 2, 2012 Glare Shield and Deburring
Jan 28, 2012 Fitted Boot Cowl
Jan 14, 2012 Riveted Trav's Forward Fuselage
Jan 11, 2012 Installed Longeron to Engine Mounts
Jan 9, 2012 Fitting Firewall and Boot Cowl
Dec 8, 2011 Welded Lugs onto Forward Cage
Dec 5, 2011 Glare Shield and Instrument Panel Fitted
Dec 3, 2011 Installed Gear Fittings
Nov 5, 2011 Fuselage #3 on Gear
Nov 3, 2011 Final Drilling Cabin Area
Oct 29, 2011 Boot Cowl and Glare Shield
Sep 26, 2011 Riveted Forward Cabin Onto Fuselage #2
Sep 21, 2011 Installed Cabin frame on Glen's Fuselage
Sep 19, 2011 Attached Firewall to Forward Cabin
Sep 17, 2011 Continued to Attach Forward Fuse/Cabin
Sep 15, 2011 Attaching Cabin to Rear Fuselage
Jul 13, 2011 Worked on Panel and Glareshield
Jun 28, 2011 Attached Firewall
Mar 19, 2011 Bottom Skin Layout & Bulkheads
Mar 13, 2011 Riveting
Mar 9, 2011 Finished Final Sizing
Mar 5, 2011 Attached Firewall to Floor
Mar 2, 2011 More Final Sizing
Feb 28, 2011 Final Sizing
Feb 26, 2011 Right Boot Cowl
Feb 23, 2011 Boot Cowl
Feb 21, 2011 Under-floor Stringers
Feb 19, 2011 Control Column Bearing Bracket
Feb 16, 2011 Seat Area L Angles
Feb 14, 2011 Seat Base Supports
Feb 13, 2011 Lower Seat Assembly
Feb 9, 2011 Forward Fuse
Feb 7, 2011 Lower Forward Assembly
Feb 5, 2011 Installed Rudder Pedal Brackets
Feb 2, 2011 Cockpit Floor continued
Jan 31, 2011 Floor Pan Layout
Jan 29, 2011 Forward Fuselage Floor Doublers
Jan 26, 2011 Ready To Rivet Forward Lower Fuselage Sides
Jan 24, 2011 Forward Lower Fuselage Sides
Jan 22, 2011 Fabricating Lower Fuse Sides
Jan 18, 2011 Started Fuselage Construction
Jan 14, 2011 Finished the Firewall
Jan 12, 2011 Firewall Construction
Jan 10, 2011 Firewall Fabrication
Jan 9, 2011 Firewall
Jan 5, 2011 Firewall
Jan 3, 2011 Firewall
Jan 1, 2011 Firewall
Dec 29, 2010 Formed Firewalls