Log Entries For Center Fuselage


DateSummary
Mar 29, 2013 Installed 75F-12-3 Door Sill Doubler Strips
Mar 11, 2013 Finished Prosealing the Header Tank
Mar 10, 2013 Prosealed Fittings onto Header Tank
Mar 9, 2013 Routing Fuel Lines from Header Tank
Mar 7, 2013 Drilling Tunnel Area to Accept Fuel Lines
Mar 6, 2013 Installing Fittings Onto Header Tank
Mar 5, 2013 Fabricated Fittings for Header Tank
Mar 4, 2013 Working on Fuel System
Jan 1, 2013 Installing Baggage Skins
Dec 13, 2012 Final Drilled Upper Door Sills
Dec 12, 2012 Left Upper Door Sill Drilled onto Cockpit Cage
Dec 11, 2012 Drilled Right Top Door Sill Doubler
Dec 10, 2012 Upper Door Sills
Dec 5, 2012 Drilled Top Door Sills
Dec 4, 2012 Left Upper Door Sill
Dec 3, 2012 Right Upper Door Sill
Nov 28, 2012 Started Installing Powder Coated Parts
Oct 22, 2012 TiG Welded Cockpit Cage Corner Braces
Oct 20, 2012 Took Cage to Guy's to Weld
Jun 24, 2012 Cockpit Cage Modification
Feb 6, 2012 Deburred and Riveted Cabin Area
Jan 25, 2012 Fitted Cabin Area to Rear Fuselage on GTB's Fuselage
Jan 24, 2012 Fitting GTB's Cabin Frame
Jan 10, 2012 Worked Extra Night
Jan 7, 2012 Fitted Cabin Area to Rear Fuselage
Dec 10, 2011 Deburred and Riveted Cabin Area
Dec 7, 2011 Fitted Seat Pans
Dec 1, 2011 Gear Fittings
Nov 30, 2011 Installed Cockpit Cage
Nov 28, 2011 Rear Spar Carry-through
Nov 26, 2011 Cabin Area
Nov 11, 2011 Solid Riveted Cabin Sides
Oct 24, 2011 Riveted Side Window Area
Oct 1, 2011 Baggage Area of Fuselage #2
Jun 22, 2011 Riveted Forward and Rearward Fuselage Together
Jun 20, 2011 Final Sizing Centre Section Rivet Holes
Jun 18, 2011 Cockpit Cage Final Drilling
Jun 13, 2011 Main Gear Fittings