Log Entries For Parts Preparation


DateSummary
Jan 22, 2013 Filed Flutes into Raised Cabin Rib Forming Blocks
Jan 13, 2013 Fabricated 75F-5-1
Jan 10, 2013 Fabricated Wing Root Rib Forming Blocks
Jan 7, 2013 Deburred Dual Stick Option Parts
Jan 7, 2013 Trip to Sweetgrass, Montana.
Jan 1, 2013 Fabricated New Right Side Baggage Skins
Nov 28, 2012 Picked Up Powder Coated Steel Parts
Nov 11, 2012 Preparing Travis's Garage
Nov 10, 2012 Preparing Travis's Garage
Nov 4, 2012 Fabricated L Angles for Door Jambs
Nov 3, 2012 Worked Door Seal Assembly Prototyping
Aug 5, 2012 Prepared 4130 Parts for Powdercoating
Aug 15, 2011 Drilled Fuselage Sides
Aug 10, 2011 Drilling Side Skins
Aug 8, 2011 Laying Out Rear Fuse Skins
Jul 11, 2011 Nosewheel Strut
Jul 4, 2011 Control Tube Issues
Mar 14, 2011 AC Covering (Decals)
Jan 19, 2011 Lower Fuse Sides
Jan 15, 2011 Received Finishing Kit
Dec 31, 2010 Bent Up 75-F-8-4
Dec 27, 2010 Firewall Forming Block
Dec 22, 2010 Christmas Celebration and Parts Clean Up
Dec 17, 2010 Laser Cutting Parts
Dec 16, 2010 Delivered Aluminum to Tradesman
Dec 15, 2010 Gathered Aluminum for Laser Cutting
Dec 14, 2010 Made L Angles
Dec 8, 2010 Sorted Out CAD Files
Dec 6, 2010 Firewall Parts Fabrication
Dec 4, 2010 Firewall Pieces
Nov 22, 2010 Fuselage Parts Decision
Oct 22, 2010 Picked Up Pallet of Aluminum for Fuselage

ExperCraft is supported by these quality vendors: