- Empennage
- Wings
- Fuselage
- Assembly
- Firewall Forward
- Landing Gear
- Painting
- Pre Flight
- Interior
- Wiring
|
Log Entries For Parts Preparation
| Date | Summary |
|
Jan 22, 2013
|
Filed Flutes into Raised Cabin Rib Forming Blocks
|
|
Jan 13, 2013
|
Fabricated 75F-5-1
|
|
Jan 10, 2013
|
Fabricated Wing Root Rib Forming Blocks
|
|
Jan 7, 2013
|
Deburred Dual Stick Option Parts
|
|
Jan 7, 2013
|
Trip to Sweetgrass, Montana.
|
|
Jan 1, 2013
|
Fabricated New Right Side Baggage Skins
|
|
Nov 28, 2012
|
Picked Up Powder Coated Steel Parts
|
|
Nov 11, 2012
|
Preparing Travis's Garage
|
|
Nov 10, 2012
|
Preparing Travis's Garage
|
|
Nov 4, 2012
|
Fabricated L Angles for Door Jambs
|
|
Nov 3, 2012
|
Worked Door Seal Assembly Prototyping
|
|
Aug 5, 2012
|
Prepared 4130 Parts for Powdercoating
|
|
Aug 15, 2011
|
Drilled Fuselage Sides
|
|
Aug 10, 2011
|
Drilling Side Skins
|
|
Aug 8, 2011
|
Laying Out Rear Fuse Skins
|
|
Jul 11, 2011
|
Nosewheel Strut
|
|
Jul 4, 2011
|
Control Tube Issues
|
|
Mar 14, 2011
|
AC Covering (Decals)
|
|
Jan 19, 2011
|
Lower Fuse Sides
|
|
Jan 15, 2011
|
Received Finishing Kit
|
|
Dec 31, 2010
|
Bent Up 75-F-8-4
|
|
Dec 27, 2010
|
Firewall Forming Block
|
|
Dec 22, 2010
|
Christmas Celebration and Parts Clean Up
|
|
Dec 17, 2010
|
Laser Cutting Parts
|
|
Dec 16, 2010
|
Delivered Aluminum to Tradesman
|
|
Dec 15, 2010
|
Gathered Aluminum for Laser Cutting
|
|
Dec 14, 2010
|
Made L Angles
|
|
Dec 8, 2010
|
Sorted Out CAD Files
|
|
Dec 6, 2010
|
Firewall Parts Fabrication
|
|
Dec 4, 2010
|
Firewall Pieces
|
|
Nov 22, 2010
|
Fuselage Parts Decision
|
|
Oct 22, 2010
|
Picked Up Pallet of Aluminum for Fuselage
|
|
ExperCraft is supported by these quality vendors:
|