Log Entries For Fuel Tanks


DateSummary
Oct 28, 2011 Final Installation of Fuel Tanks in Right Wing
Oct 23, 2011 Installing Fuel Tank System in Right Wing
Oct 20, 2011 Readied Right Wing to Install Fuel Tanks
Jul 5, 2011 Tank Drain
Jun 26, 2011 Measure Out Fuel Filler Cut Outs on Top Wing Skin
May 1, 2011 Pressure Tested Fuel Tanks
Nov 29, 2010 Fabricated Fuel Lines
Nov 11, 2010 Fuel Tank Securement Straps
Nov 5, 2010 Fuel Tank Holding Straps
Oct 31, 2010 Tank Cushions
Oct 28, 2010 More Tank Shimming
Oct 27, 2010 Glued Cork Onto TC's Tanks
Oct 26, 2010 Shimming Left Wing Tanks
Oct 25, 2010 Began Installing Tanks in Wings
Oct 20, 2010 Finished Prosealing Tanks!
Oct 18, 2010 Installed Filler Fittings and Prosealed First Tank Top
Oct 17, 2010 Finishing Fuel Fittings
Oct 16, 2010 Fuel Tank Holding Straps and Welded Filler Neck Fittins
Oct 14, 2010 Drilled Drain Fitting Holes in TC's Wing
Oct 13, 2010 Cut Fuel Filler Tubes
Oct 12, 2010 Cut apart old Filler Fittings
Oct 11, 2010 Drilled Fuel Tank Drains Into Right Wing Bottom Skins
Oct 11, 2010 Filler Fitting Problems
Oct 9, 2010 Pro Sealing and Filler Fitting Installation
Oct 7, 2010 Machined Filler Necks
Oct 6, 2010 Pro Sealing Tanks
Oct 4, 2010 Pro Sealing Tanks
Oct 2, 2010 Prosealing Tanks
Sep 29, 2010 Pro Sealing Tank Bottoms
Sep 27, 2010 Senders and Filler Necks
Sep 26, 2010 Tank Filler Fabrication
Sep 25, 2010 Fuel Level Sender Installs
Sep 22, 2010 Tank Fittings
Sep 20, 2010 Started Installing Tank Fittings
Sep 18, 2010 Finished Drilling Tank Top Skins
Sep 18, 2010 Finished
Sep 15, 2010 Drilling Tank Top Skins
Sep 13, 2010 Fuel Tank Top Skins
Sep 12, 2010 JH Fuel Filler Neck Fabrication
Sep 11, 2010 More of the Same (Fuel Tank Construction)
Sep 8, 2010 Drilling Tanks
Sep 6, 2010 Filler Neck Design and Parts Order Discussion
Sep 4, 2010 Filler Neck Design
Sep 1, 2010 Cutting Out Fuel Tank Skins
Aug 28, 2010 Fuel Tank Work Continues
Aug 25, 2010 Fuel Tanks Continued
Aug 23, 2010 Building Tanks Continue
Aug 18, 2010 Tank Size Issues
Aug 16, 2010 First Tank Closer to completion
Aug 14, 2010 Constructing First Tank
Aug 11, 2010 Drilled and Clecoed First Tank
Aug 9, 2010 Riveting Tanks
Aug 7, 2010 Quest for Fuel Tank Construction Method Continues
Aug 4, 2010 Made Fuel Tank Side Ribs
Jul 19, 2010 Practising TIG Welding
Jul 14, 2010 Practising TIG Welding
Jul 12, 2010 Readying for Fuel Tank Construction