Log Entries For Forward Fuselage


DateSummary
Oct 5, 2011 Install carpeting on glare shield
Sep 24, 2011 Install fuel tank straps
Sep 22, 2011 Install Fuel Tank
Jul 28, 2011 Finished cabin heat control
Jul 26, 2011 Cabin heat control
Jul 25, 2011 Cabin details - heat vents, transponder, fire extinguisher
Jul 10, 2011 Mixture mount, bottom seat cushion
May 3, 2011 Install throttle and mixture cables and cable support
Oct 12, 2010 New F07-11 brackets for Steinair Vents
Oct 5, 2010 Glare shield, tail wheel mount
Sep 30, 2010 Seat hinge, floor frames, panel support
Sep 29, 2010 Glare shield and interior parts
Sep 19, 2010 Drill to size
Sep 10, 2010 Motor Mount
Sep 9, 2010 Mount forward fuselage
Sep 8, 2010 Left side brake handle
Sep 7, 2010 Seat pan, flap and brake handles
Sep 5, 2010 Prime forward floor, polish forward floor.
Sep 4, 2010 Disassemble forward fuselage
Sep 3, 2010 Drill fuselage
Sep 2, 2010 Tunnel Z's and firewall
Sep 1, 2010 Bottom skin
Aug 31, 2010 Flip fuselage, work on bottom skin
Aug 27, 2010 Left skin
Aug 26, 2010 Repair of right skin verticals
Aug 24, 2010 Seat Sling, Glare shield and panel
Aug 24, 2010 Seat pan
Aug 22, 2010 Seat Belt Attach Angle
Aug 21, 2010 Completed page F10 aft cabin details
Aug 20, 2010 Parts preparation
Aug 19, 2010 Aft Cabin Details (clips, brackets, et cetera)
Aug 18, 2010 Left skin
Aug 17, 2010 Drill, cleco, debur left fwd skin
Aug 15, 2010 Began left skin, discovered problem with right skin
Aug 14, 2010 Finished right foward fuselage skin
Aug 13, 2010 Right skin ready to debur
Aug 12, 2010 Upper longerons
Aug 11, 2010 Dimple and countersink set up for tunnel webs
Aug 8, 2010 Forward angle and attach angles
Aug 7, 2010 Forward side panel
Aug 5, 2010 Lower forward foreskin, tunnel Z, Cross ties

ExperCraft is supported by these quality vendors: