Log Entries For Main Spar


DateSummary
Dec 29, 2010 Finished drilling main wing attach bolts. Panel work.
Dec 23, 2010 More fitting
Dec 22, 2010 Final drill rear spar, right main spar
Dec 21, 2010 Adjust wing mounts
May 2, 2010 Rivet left wing box frame
May 1, 2010 Left wing box frame
Apr 17, 2010 Root Rib
Apr 16, 2010 Left Wing Box frame
Apr 2, 2010 Finished Right wing box frame and modified vert stab.
Mar 29, 2010 Prepare ribs
Mar 23, 2010 Rib # 9
Mar 22, 2010 Front spars 1 - 4
Mar 21, 2010 Root Ribs
Mar 20, 2010 Aileron and flap pivots, contemplate spars
Mar 12, 2010 Prepare ribs
Mar 11, 2010 Left Spar
Mar 10, 2010 Left spar
Mar 9, 2010 W13 right side main spar
Mar 8, 2010 Right main spar miscellaneous parts
Mar 6, 2010 End attach angle, Right main rib
Mar 4, 2010 W17-04 & 08 Reinforcement angles
Mar 3, 2010 W17 Support Angles
Feb 21, 2010 Unpack Main Spars, debur parts

ExperCraft is supported by these quality vendors: