Log Entries For Main Gear


DateSummary
Jul 14, 2007 Brakes removed and wheels/tires temp mounted
Jul 11, 2007 Bolt brake disc and safety wire
Jul 10, 2007 Finished drill the main gear legs
Jul 9, 2007 Drilling the main gear legs
Jul 7, 2007 Main gear aligned for drilling
Jul 5, 2007 Installing axles and mounting tires and tubes
Jun 28, 2007 Fitting main gear legs

ExperCraft is supported by these quality vendors: