Log Entries For Parts Preparation


DateSummary
Feb 5, 2009 Installed conduit for wing tip wiring.
Jan 29, 2009 Started on the left wing
Jan 9, 2009 2nd coat of 50/50 glue and assemble the fuel cap retainer
Jan 8, 2009 Fill LE joint - cover LE bolts
Jan 5, 2009 Calibrate irons and sand filler
Jan 3, 2009 Body filler on the leading edge wrap/spar joint
Jan 2, 2009 Preparing the right wing for covering.
Jul 24, 2007 Preparing the wing rib jig
Jul 14, 2007 Not really parts prep for the wings.

ExperCraft is supported by these quality vendors: