- Empennage
- Wings
- Fuselage
- Assembly
- Firewall Forward
- Landing Gear
- Painting
- Panel
- Interior
- Engine Building
- Wiring
|
Log Entries For Miscellaneous
| Date | Summary |
|
Nov 5, 2011
|
press check sump tank and install
|
|
Oct 30, 2011
|
fuel system sump tank
|
|
Nov 2, 2010
|
installed over head fresh air duct
|
|
Jan 4, 2010
|
finish hot air supply manifold and door
|
|
Jan 3, 2010
|
floor/cabin heat
|
|
Jan 1, 2010
|
added bid to passenger windows
|
|
Dec 31, 2009
|
removed mold flanges
|
|
Dec 31, 2009
|
micro glass inside windows
|
|
Dec 30, 2009
|
installed side passenger windows
|
|
Dec 29, 2009
|
cut side windows/prep for install
|
|
Dec 27, 2009
|
windshield inner glassing
|
|
Dec 26, 2009
|
instaled windshield/finish upper naca
|
|
Dec 24, 2009
|
fitting wind screen
|
|
Dec 24, 2009
|
naca fresh air upper/started wind shield cut out
|
|
Dec 23, 2009
|
upper aft fresh air naca/nose wheel acces cover
|
|
Dec 22, 2009
|
top aft fresh air naca
|
|
Dec 21, 2009
|
fitted main naca intakes
|
|
Dec 20, 2009
|
nose acces/main cooling intake nacas
|
|
Dec 19, 2009
|
oil cooler flange/fuselage exahust
|
|
Dec 17, 2009
|
oil cooler control/exhaust duct
|
|
Dec 12, 2009
|
trim&glass naca scoops
|
|
Dec 11, 2009
|
instaling fresh air &oil cooler naca scoops
|
|
Oct 31, 2009
|
speed brake final /final
|
|
Oct 29, 2009
|
speed brake cyl.final
|
|
Oct 10, 2009
|
Keel
|
|
Sep 30, 2009
|
Keel Installation
|
|
Sep 13, 2009
|
Battery Tray and Landing Light
|
|
Sep 12, 2009
|
Keel
|
|
Sep 10, 2009
|
Keel
|
|
Sep 8, 2009
|
Keel Preparation and Assembly
|
|
Sep 8, 2009
|
Wiring Ducts
|
|
Aug 23, 2009
|
Speed Brake Actuator
|
|
Aug 23, 2009
|
Assembly of Speed Brake and Set-up Keel
|
|
Aug 22, 2009
|
Speed Brake Triax Cover
|
|
Aug 3, 2009
|
Keel
|
|
ExperCraft is supported by these quality vendors:
|