Log Entries For Flight Controls
| Date | Summary |
|
Jun 29, 2012
|
Moved throttle quadrant. Ground testing
|
|
Jun 29, 2012
|
Moved throttle quadrant.
|
|
Jun 9, 2012
|
Work Jun. 8 & 9 below seat
|
|
Dec 2, 2009
|
Installing trim cable
|
|
Sep 23, 2009
|
Confirmed that the idler to mixer control rod is too long and emailed Sonex for comment; worked more on marking and installing the elevator control drive.
|
|
Sep 22, 2009
|
Made and installed the bushings for the remaining rod end bearings and riveted the "H" section to the fuse floor.
|
|
Aug 25, 2009
|
Re-installed flap and brake drives; some rivets
|
|
Jul 4, 2009
|
Making parts for trim and brake systems
|
|
Jul 2, 2009
|
Making trim system parts
|
|
Jun 12, 2009
|
Installing flap drive assembly.
|
|
Jun 9, 2009
|
Glare shield and mixer mount
|
|
May 5, 2009
|
Connecting rudder cables; drilling out tailwheel caster
|
|
May 4, 2009
|
Rudder cables - filing for cable clearance
|
|
Apr 30, 2009
|
More rudder cable work; initial drilling to mount inst. panel
|
|
Apr 29, 2009
|
Finished mounting rudder peddles and installed the mixer assy; pictures
|
|
Apr 28, 2009
|
Mounted the rudder peddles in the cockpit.
|
|
Apr 27, 2009
|
Made the right and left rudder cable adjusters; more panel contemplation
|
|
Apr 6, 2009
|
Making rudder blocks
|
|
Apr 5, 2009
|
Install flap detent assy: work on control stick assy
|
|
Mar 24, 2009
|
Paint removal and bearing reaming for control stick assembly
|
|
Mar 23, 2009
|
Looking at control system parts to start some sub assemblies
|
|
Jan 17, 2009
|
Making detent assembly from C08 and filled gap between wing tips and nav light extensions
|
|