Log Entries For Flight Controls


DateSummary
Jun 29, 2012 Moved throttle quadrant. Ground testing
Jun 29, 2012 Moved throttle quadrant.
Jun 9, 2012 Work Jun. 8 & 9 below seat
Dec 2, 2009 Installing trim cable
Sep 23, 2009 Confirmed that the idler to mixer control rod is too long and emailed Sonex for comment; worked more on marking and installing the elevator control drive.
Sep 22, 2009 Made and installed the bushings for the remaining rod end bearings and riveted the "H" section to the fuse floor.
Aug 25, 2009 Re-installed flap and brake drives; some rivets
Jul 4, 2009 Making parts for trim and brake systems
Jul 2, 2009 Making trim system parts
Jun 12, 2009 Installing flap drive assembly.
Jun 9, 2009 Glare shield and mixer mount
May 5, 2009 Connecting rudder cables; drilling out tailwheel caster
May 4, 2009 Rudder cables - filing for cable clearance
Apr 30, 2009 More rudder cable work; initial drilling to mount inst. panel
Apr 29, 2009 Finished mounting rudder peddles and installed the mixer assy; pictures
Apr 28, 2009 Mounted the rudder peddles in the cockpit.
Apr 27, 2009 Made the right and left rudder cable adjusters; more panel contemplation
Apr 6, 2009 Making rudder blocks
Apr 5, 2009 Install flap detent assy: work on control stick assy
Mar 24, 2009 Paint removal and bearing reaming for control stick assembly
Mar 23, 2009 Looking at control system parts to start some sub assemblies
Jan 17, 2009 Making detent assembly from C08 and filled gap between wing tips and nav light extensions

ExperCraft is supported by these quality vendors: