- Empennage
- Wings
- Fuselage
- Assembly
- Firewall Forward
- Landing Gear
- Painting
- Weight And Balance
- Pre Flight
- Panel
- Interior
- Engine Building
- Wiring
|
Log Entries For Ribs
| Date | Summary |
|
Jan 15, 2010
|
Completed the right wing box.
|
|
Jan 14, 2010
|
Right wing box is assembled.
|
|
Jan 13, 2010
|
Attached the aft ribs to the main spar.
|
|
Jan 12, 2010
|
Left wing ready for skin.
|
|
Jan 11, 2010
|
Updrilled, deburred and began riveting left wing frame.
|
|
Jan 8, 2010
|
Attaching ribs to left wing spar.
|
|
Jan 6, 2010
|
Adding gussets to ribs.
|
|
Jan 5, 2010
|
Riveting gussets on Ribs 1, 2 and 3 for both wings.
|
|
Jan 4, 2010
|
Riveted the rib 9 assembly.
|
|
Dec 30, 2009
|
Rib 9 assembly left wing.
|
|
Nov 9, 2009
|
Completed forming the wing ribs.
|
|
Nov 6, 2009
|
Forming aft wing ribs.
|
|
Nov 5, 2009
|
Finished gussets and have started on forming the ribs
|
|
Nov 3, 2009
|
Deburring wing ribs and making gussets
|
|
Nov 2, 2009
|
Making aft wing rib blanks
|
|
Jun 3, 2009
|
Prepare patterns for rib formers
|
|
ExperCraft is supported by these quality vendors:
|