Log Entries For Flaps


DateSummary
Mar 13, 2010 Rebuilt the right wing flap.
Jan 30, 2010 Completed deburring and riveting the flaps.
Jan 29, 2010 Both flaps updrilled, deburred and reassembled.
Jan 28, 2010 Both flaps assembled.
Jan 27, 2010 Left flap is drilled and updrilled.
Jan 25, 2010 Worked on the flaps.
Jan 19, 2010 Completed the ribs and control ribs for the two flaps.

ExperCraft is supported by these quality vendors: