Log Entries For Forward Fuselage


DateSummary
Mar 2, 2012 selector valve and fuel lines in place
Feb 29, 2012 Fuel lines fabricated
Feb 8, 2012 Mock up fuel line routing
Dec 10, 2011 rivet fwrd section floor channels to center spar
Dec 4, 2011 Left front side skin inspection panel
Dec 2, 2011 Installed optional inspection panel rt side
Nov 25, 2011 Connected brake line to cylinders
Nov 19, 2011 mounted brake reservoir
Oct 12, 2011 mounted rudder peddle springs
Aug 26, 2011 Rivet fwd belly skin
Aug 18, 2011 Fitting forward belly skin
Mar 20, 2010 Rudder pedal modification
Feb 22, 2010 Matched up forward belly skin to center section
Feb 19, 2010 Bonded NACA vents to side skins
Feb 13, 2010 disconnected frwd section from center section
Feb 7, 2010 Completed final trimming for NACA vents
Feb 5, 2010 Cut out right skin NACA duct
Feb 2, 2010 NACA duct
Jan 27, 2010 Debur upper frame
Jan 23, 2010 Completed debur of forward side skins
Jan 18, 2010 Removed forward side skins
Jan 17, 2010 Debur cowl strips
Jan 12, 2010 remove and debur top skin
Dec 19, 2009 completed drilling upper skin and cowl straps
Dec 6, 2009 Drilling upper skin
Dec 4, 2009 Refitted upper skin
Dec 3, 2009 Fitted upper skin
Dec 1, 2009 Fit cowling attach straps
Nov 29, 2009 Powder coated rudder peddle assy and drilled longerons to #30
Nov 15, 2009 Drilled forward longerons #40
Nov 1, 2009 Reattached center section skins to verify alignment
Oct 28, 2009 Left and right fwd side skins fitted
Oct 26, 2009 Right fwd side skin formed
Oct 24, 2009 Rolled the bottom edge of left forward side skin
Oct 23, 2009 Fabricated misc spacers and primed parts
Oct 19, 2009 fitted forward fuselage to center fuselage
Oct 13, 2009 Installed instrument panel frame nut plates
Oct 11, 2009 Completed riveting of upper fwd fuselage
Oct 7, 2009 Rudder cable pulley attach bracket assembly
Oct 5, 2009 Modified Floor board for brake cylinder brakets
Sep 25, 2009 Cut dummy brake cylinders to length
Sep 19, 2009 Assembled rudder peddle torque tube blocks
Sep 16, 2009 Installed floor board and panel nutplates
Sep 11, 2009 One piece floor board
Aug 30, 2009 Upper forward fuselage assembly
Aug 23, 2009 riveted channel bulkheads
Aug 22, 2009 Riveted floor channels/weldments to firewall
Aug 21, 2009 Completed floor channels
Aug 16, 2009 Deburr and prep floor channels and angles
Aug 15, 2009 remove floor channels fom firewall
Aug 11, 2009 removed belly skin and deburred
Aug 10, 2009 Drilling forward belly skin
Aug 9, 2009 Drilling forward belly skin
Aug 8, 2009 Drilled #30 through firewall angle and floorboard channel
Aug 3, 2009 Cleco forward belly skin
Jul 31, 2009 Drilled floor channel assy for nut plates
Jul 27, 2009 floor reinforcement and bulkhead channels
Jul 26, 2009 Floor Channels
Jul 25, 2009 riveted upper weldments and clip stiffeners
Jul 21, 2009 prepared and riveted cross brace
Jul 19, 2009 Riveted upper angles and gusset
Jul 18, 2009 Prep upper angles and gusset
Jul 17, 2009 side and lower angles riveted
Jul 12, 2009 Drilled firewall steel engine mount supports
Jul 11, 2009 Riveted firewall center channel and plate reinforcement
Jul 9, 2009 riveting firewall
Jul 7, 2009 Riveting firewall
Jul 6, 2009 disassemble and debur firewall
Jul 1, 2009 Floor reinforcement channels and angles
Jun 30, 2009 Firewall parts assy #7 & 8
Jun 28, 2009 Prep and prime steel weldments and plates
Jun 26, 2009 Firewall
Jun 24, 2009 Upper forward fuselage assy 2,3&4 riveted
Jun 20, 2009 Completed deburring and started reassembly
Jun 13, 2009 upper foward fuselage deburring
Jun 12, 2009 Formed joggle on fuselage channels and stiffener
Apr 14, 2009 Upper forward fuselage assembly
Apr 11, 2009 organize forward fuselage parts

ExperCraft is supported by these quality vendors: