Log Entries For Rear Fuselage


DateSummary
Aug 7, 2011 Rivet top skin
Aug 1, 2011 fastened tail cone top skin
Jul 24, 2011 Bolted the VS to bulkhead 5
Jul 24, 2011 Attached Vertical Stabilizer
Apr 4, 2011 Connected trim servo
Mar 25, 2011 spiral wrap and cable clamp wire runs
Mar 20, 2011 Debur tail cone
Jan 21, 2011 completed 330 drilling
Jan 18, 2011 Drilling top skin
Jan 15, 2011 Auto pilot pitch servo mount
Jan 14, 2011 Tail cone top skin
Jan 9, 2011 misc wiring tasks
Jan 4, 2011 Seat belt cattach and gusset
Jan 2, 2011 Tail cone top skin
Jan 1, 2011 Static lines
Nov 3, 2010 stiffeners riveted to top skins
Nov 1, 2010 Tail cone top skins
Oct 24, 2010 Static line
Oct 18, 2010 Trial fit foot steps
Oct 17, 2010 completed riveting side skins to belly skin
Oct 7, 2010 Aft push pull tube
Oct 5, 2010 completed riveting bulkhead5 and closeout
Oct 4, 2010 riveted side skins
Sep 29, 2010 final drill and debur closeout
Sep 27, 2010 match drilled closeout skin
Sep 21, 2010 final instal of bulkhead 5 and trial fit trim servo
Sep 20, 2010 Riveting top bulkheads
Sep 16, 2010 test fit vertical stabilator
Sep 12, 2010 completed drilling longerons and baggage closeout nut plates
Sep 11, 2010 Tailcone longerons
Sep 8, 2010 riveted bulkhead 1 assy
Sep 6, 2010 bulkhead nut plates
Sep 4, 2010 Installed nut plates lower #1 bulkhead
Sep 3, 2010 riveted side corner stiffener
Aug 30, 2010 riveted bell crank assy to belly skin
Aug 29, 2010 bellcrank assy and side skins
Aug 20, 2010 rivet stiffeners to belly skin
Aug 16, 2010 Bulkhead 4 pulleys
Aug 14, 2010 trimmed bellcrank bushings to final size
Aug 11, 2010 Bell crank and pulley Trial assembly
Aug 8, 2010 stabilator bell crank and bulkhead#1
Aug 6, 2010 bulkhead #1
Aug 4, 2010 riveted stiffeners to closeout skin
Aug 3, 2010 prep close out skin
Aug 1, 2010 close out skin
Jul 31, 2010 riveted bulkheads
Jul 30, 2010 top bulkheads 2&3
Jul 29, 2010 riveted bulkhead 4 assy
Jul 27, 2010 Bulkhead 4
Jul 25, 2010 Bulkhead 5 riveted and side skins fitted to belly skin
Jul 23, 2010 Bulkhead 5
Jul 18, 2010 riveted side wall gusset
Jul 16, 2010 Side skin aft assy
Jul 15, 2010 Bulkhead 5 and drilled corner stiffener
Jul 4, 2010 Bellcrank channel and belly skin stiffeners
Jul 3, 2010 Access panel rings and nutplates
Jun 29, 2010 belly skin and stiffeners
Jun 28, 2010 fitted side skin bulkheads and stiffeners
Jun 16, 2010 left side skin formed
Jun 13, 2010 Tail cone rt side formed
May 26, 2010 tailcone aft assy, bellcrank channel, and bulkheads
May 26, 2010 tailcone aft assy, bellcrank channel, and bulkheads
Apr 18, 2010 removed protective plastic
Apr 4, 2010 ready to form side skins
Apr 2, 2010 Started tailcone assembly