Log Entries For Cowling


DateSummary
Mar 30, 2010 Cowling has arrived
Dec 14, 2014 First cowling work
Mar 8, 2015 Cowing and plenum prep
Mar 18, 2015 first cut on top cowling
Mar 19, 2015 1/4-turn fasteners, top cowl
Mar 20, 2015 1/4 fastener strip, sides and bottom
Mar 28, 2015 top cowl attach points
Apr 10, 2015 top cowling on the firewall
Jun 5, 2015 Lower cowl fitting
Jun 6, 2015 bottom cowl firewall done
Jun 7, 2015 Cowling horizontal joint
Jun 13, 2015 cowling getting close...
Jun 14, 2015 Cowling nose and oil door
Jul 1, 2015 oil door
Jul 12, 2015 Cowling and plenum work (again...)
Jul 13, 2015 oil door touchup
Aug 14, 2015 cooling air inlet rings
Aug 16, 2015 right inlet ring redone
Aug 22, 2015 left inlet ring redone
Apr 2, 2016 Opening the exit area
Jun 25, 2016 Cowl flap installed

ExperCraft is supported by these quality vendors: