- Empennage
- Wings
- Fuselage
- Firewall Forward
- Panel
- Engine Building
- Wiring
|
Log Entries For Horizontal Stabilizer
| Date | Summary |
|
Dec 28, 2007
|
The empennage arrives...2 hours
|
|
Jan 15, 2008
|
First, a new work bench is needed...2 hours
|
|
Jan 22, 2008
|
First actual airplane parts! 2 hours
|
|
Jan 24, 2008
|
HS skeleton assembly - 4 hours
|
|
Jan 25, 2008
|
The boring part...2 hours
|
|
Jan 26, 2008
|
The skin goes on! 5.5 hours
|
|
Jan 27, 2008
|
Lots of work today...6 hours
|
|
Jan 28, 2008
|
That sinking feeling...1.75 hours
|
|
Jan 29, 2008
|
Yup, I was right....
|
|
Feb 6, 2008
|
Alodined the angle attach brackets
|
|
Feb 12, 2008
|
Back on track with new front spars...3.75 hours
|
|
Feb 13, 2008
|
fitting the new spars...2.25 hours
|
|
Feb 14, 2008
|
Ready to drive some rivets...3 hours
|
|
Feb 15, 2008
|
Shootin' Rivets...4.25 hours
|
|
Feb 16, 2008
|
Lots of rivets...6.5 hours
|
|
Feb 17, 2008
|
HS is done! 3.75 hours
|
|
May 16, 2010
|
HS fitted to the fuse
|
|
May 18, 2010
|
Murphy strikes again...
|
|
May 19, 2010
|
Elevator pushrod fitted
|
|
Jun 3, 2010
|
HS is bolted in
|
|