DateSummary
Oct 24, 2009 Brake pedals being assembled
Oct 25, 2009 Brake pedals done
Feb 2, 2010 Flaps
Feb 14, 2010 Flap Actuator
Feb 15, 2010 flap actuator continued
Feb 19, 2010 Flap actuator assembly
Feb 25, 2010 Flap drive is done!
Feb 28, 2010 One step forward, two steps back
Apr 18, 2010 Control sticks and rudder pedals in
Oct 16, 2010 Autopilot pitch servo installed
Oct 1, 2011 autopilot servos removed
Feb 25, 2012 Elevator pushrod fabbed and installed
Mar 3, 2012 Flap controller installed
Nov 10, 2012 Flap pushrods adjusted
Dec 9, 2012 Rudder cable bolts changed out
Dec 14, 2012 aileron trim
Dec 18, 2012 more aileron trim
Jan 1, 2013 aileron trim done