- Empennage
- Wings
- Fuselage
- Firewall Forward
- Panel
- Engine Building
- Wiring
|
Log Entries For Flight Controls
| Date | Summary |
|
Oct 24, 2009
|
Brake pedals being assembled
|
|
Oct 25, 2009
|
Brake pedals done
|
|
Feb 2, 2010
|
Flaps
|
|
Feb 14, 2010
|
Flap Actuator
|
|
Feb 15, 2010
|
flap actuator continued
|
|
Feb 19, 2010
|
Flap actuator assembly
|
|
Feb 25, 2010
|
Flap drive is done!
|
|
Feb 28, 2010
|
One step forward, two steps back
|
|
Apr 18, 2010
|
Control sticks and rudder pedals in
|
|
Oct 16, 2010
|
Autopilot pitch servo installed
|
|
Oct 1, 2011
|
autopilot servos removed
|
|
Feb 25, 2012
|
Elevator pushrod fabbed and installed
|
|
Mar 3, 2012
|
Flap controller installed
|
|
Nov 10, 2012
|
Flap pushrods adjusted
|
|
Dec 9, 2012
|
Rudder cable bolts changed out
|
|
Dec 14, 2012
|
aileron trim
|
|
Dec 18, 2012
|
more aileron trim
|
|
Jan 1, 2013
|
aileron trim done
|
|
ExperCraft is supported by these quality vendors:
|