Log Entries for Fuel Tanks
Log Entry Date: Jul 19, 2008
Fuel Tanks
A little more progress...
Tonight I drilled the fuel tank attach brackets for the platenut rivets, countersunk them on the aft face to accept the 426AD3-4 rivets, then cleaned and primed them, and installed the nutplates on the brackets with the exception of the most inboard, which has the nutplates installed on the aft side of the front spar.
| Priming the tank attach brackets after countersinking. |
| Finished fuel tank attach brackets with nutplates installed. |
| Platenuts set on the aft side of the front spar for the most inboard fuel tank attach angle. |
